Finishing and Fit-Out Services, with Defined Scope and Timeline

Each service has a clear scope of work and an estimated duration that serves as the starting point for schedule negotiations, not the end point.

Installing glass partitions in an office floor in Riyadh

Office Fit-Out

We convert a raw floor or an old office into a ready-to-use work environment, coordinated with building management and civil defense requirements.

  • Glass and gypsum partitions and doors
  • Suspended ceilings, lighting and air conditioning systems
  • Data and electrical networks and alarm systems
  • Built-in furniture, reception and meeting rooms

Estimated duration: 8 to 14 weeks for an area of 1,000 to 3,000 m²

A craftsman installing large marble tiles in a villa hall

Villa Finishing

From structure to turnkey handover, or partial finishing of an existing villa. The owner chooses from the sample board and sees the price before approval.

  • Marble, porcelain and wooden floors
  • Gypsum, concealed lighting and paints
  • Kitchens, doors and cabinets made to measure
  • Majlis and facades with Najdi elements

Estimated duration: 16 to 26 weeks for a villa of 500 to 1,000 m²

A car showroom with a glossy floor and linear lighting

Showrooms and Shops

We implement the brand identity in the space, and we respect the work windows set by the mall and the announced opening date.

  • Glass facades and outdoor signage
  • Display lighting and custom display units
  • Polished concrete and epoxy floors
  • Approvals from mall management and civil defense

Estimated duration: 6 to 12 weeks

A technician maintaining an air conditioning vent in an office ceiling

Maintenance and Renovation

Regular maintenance contracts for offices and showrooms, and partial renovation without interrupting the client's daily operations.

  • Monthly preventive visits with a written report
  • Response within 24 hours in Riyadh
  • Repainting and replacing floors and ceilings
  • Lighting upgrade to energy-saving systems

Estimated duration: 1 week to 6 weeks for renovation

Project stages02

From the first visit until the end of the warranty

  1. 1

    First visit

    Within 48 hours

    Inspection, measurement and photography, understanding what the space needs and what it allows.

  2. 2

    Design and quantities

    2 to 4 weeks

    Execution drawings, a sample board and a bill of quantities priced item by item.

  3. 3

    Contract and schedule

    1 week

    A written handover date, a daily delay penalty, and payments linked to stages.

  4. 4

    Execution

    As per schedule

    Report and photos every Thursday, and one project manager who answers his phone.

  5. 5

    Documented handover

    On the due date

    Inspection tour with a checklist of 180 items and a minutes document signed by the client.

  6. 6

    Warranty period

    12 to 24 months

    Visits after 3 months and another after 11 months, and any observation fixed at no cost.

Frequently asked questions03

Before You Request a Quote

Request a quote
How long does it take to prepare a quote?

We visit the site within 48 hours of your request, and send the quote with the quantity schedule within 5 working days of receiving the drawings.

Do you work outside Riyadh?

Yes, we operate in Riyadh, Jeddah and Dammam with dedicated teams in each city.

What happens if delivery is delayed?

The contract includes a specified daily delay penalty, and we document any delay and its cause in the published handover log.

What is the warranty period?

12 months on finishing works, and two years on electrical and plumbing works, starting from the signed handover date.